Clerkenwell Design Week understands how important Spa Fields is to the local community and we are so grateful we are able to use it for our annual event, below is a full outline of the schedule and how it may affect you during this time.

Track way installation: Monday 14 May

How this will affect me: Large Vehicles arrived to install protective matting in Spa Fields, this took no more than 90 minutes and was scheduled between 9 and 11:30am, this meant slight congestion on Northampton Road during this time and increased noise levels in Spa Fields.

Build Up: Tuesday 15 May – Monday 21 May 08:00-18:00  

How this will affect me: For health and Safety purposes there was restricted access to the vehicle park entrance on Northampton Road. However, all other entrances will remain open. There will be suspended parking and possible congestion on Northampton Road during this time with large vehicles offloading.

Show Open: Tuesday 22 May – Thursday 24 May 10:00- 21:00

How this will affect me: There was a higher level of footfall around the area at this time, however this was open for everyone and had a designated registration area where you can access the festival sites.

Break down: Friday 25 May – Sunday 27 May 08:00-18:00                                                                                          

How this will affect me: For health and Safety purposes there was restricted access to the vehicle park entrance on Northampton Road. However, all other entrances remained open. There was be suspended parking and possible congestion on Northampton Road during this time with large vehicles offloading.

Bank Holiday Monday (28 May): To ensure Spa Fields is clear of any break down activity on Bank Holiday Monday, we delayed the matting and Trackway to be collected on Tuesday 29 May at a reasonable hour in the morning.

Track way Collection: Tuesday 29 May

How this will affect me: Large Vehicles will arrived to collect the protective matting in Spa Fields, this takes no more than 90 minutes per park and was scheduled between 9 and 11:30am, this meant slight congestion on Northampton Road during this time and high noise levels in Spa Fields.